Designation of POG at the order:
Designation of POG at the order:
- "P" - execution P - installation of equipment included in the POG, is carried out on a metal frame;
- "W" - performance W - installation of equipment included in the POG, is carried out in a protective metal cabinet with or without thermal insulation;
- "B" - execution B - installation of equipment included in the POG, is carried out in a protective box with thermal insulation;
3 - maximum gas consumption under operating conditions of measurement by one measuring line m³ / h;
4 - maximum gas consumption under operating conditions, measured by the second measuring line, if any,
4 - maximum gas consumption under operating conditions, measured by the second measuring line, if any,
4 - maximum gas consumption under operating conditions, measured by the second measuring line, if any,
- "B" - no bypass;
- "B" - no bypass;
- "B" - no bypass;
- "B" - no bypass;
- "B" - no bypass;
- "B" - no bypass;
At the request of the consumer, orders are accepted for POG as a whole and for individual components, as well as according to the project approved by the gas supply organization.